Architect

Scope

$2,000,000

SQ. FT.

11,145

Officially completed in Spring 2021, the Jerome Township Fire Department was constructed during the COVID-19 Pandemic and following the dam failures of 2020 in Sanford, Michigan.

Fire rescue vehicles stationed inside the Jerome Township Fire Department.

Expanded Amenities to Serve the Local Community

As the local community continued to grow, it was clear that Jerome Township needed an updated fire department that would serve local citizens well into the future.

The new 11,145 SF station includes a backup generator system that maintains power across the entire structure during power outages, decontamination areas, storage spaces for equipment, a men’s locker room, a women’s locker room, a dispatch room, offices, and a meeting room that doubles the size of their former meeting area.

The station also includes radiant floor heating in the apparatus bays, facilitating the effortless melting of snow and ice from trucks and equipment during the winter.

 

Two fire rescue vehicles stationed inside the Jerome Township Fire Department.
A meeting space inside the Jerome Township Fire Department.

Related Projects

Fisher Companies Headquarters

This LEED Silver-certified facility replaced and consolidated existing offices for various Fisher Companies’ Midland operations. Three Rivers worked closely with Fisher throughout the design and ...

Learn More

MacAllister Rentals

MacAllister Rental specializes in servicing construction jobs with equipment. This new building is pre-manufactured that houses office space, sales and showroom area, and a large shop. The building ...

Learn More

Sanford Hardware

Reportedly built in 1885, the building that housed a general merchandise store and post office before becoming Sanford Hardware had been a staple in the Sanford community for well over 125 years. A ...

Learn More